Lighthouse has a new layout. Prefer the old one? Return to the old layout, and switch back any time from the link at the top of each page.

0.2 (Alpha 2)

∞ days late

Progress

 

% Complete

100%

Tickets Left

0

Same functions as 0.1 at a usable status. User roles must be fully implemented.

Expected Mar 28th, 2009